PROJECT
The new £350 million, state of the art hospital has 560 beds within 55,000 m2 to provide complex specialist and critical care treatment for over 600,000 people in South-East Wales. Construction by the main contractor, Laing O’Rourke began in summer 2017 with the hospital originally due to accept patients in Spring 2021, but after a call from the Health Board asking the project team to accelerate delivery as part of its covid-19 preparations, the hospital was handed over and able to take patients four months early. Mike Lewis, Laing O’Rourke Project Director said: “Early hand over was possible because we used Modern Methods of Construction (MMC) from the outset and in doing so were able to deliver 50% of the building to Aneurin Bevan University Hospital Board back in April – a year earlier than originally scheduled. This project marks a pivotal point in healthcare delivery, paving the way for future hospital builds.”
PRODUCTS
THE CHALLENGE
Daikin was contracted to supply 57 HTM compliant, packaged Professional Air Handling Units, each designed and delivered on one common base, meaning less on-site work and lifting equipment and a subsequent cost saving for the client. Read more here about the importance of mechanical ventilation as a solution for the against Coronavirus.